On-site tank installation at no cost for qualifying contract customers taking wholesale bulk diesel on credit terms. 23,000L and 46,000L tanks for construction, mining, agriculture and industry across South Africa.
More than 100,000L per month, a minimum 36-month agreement and approved 30-day credit terms only are required.
Apply for diesel storage tank installation on credit · Wholesale bulk diesel on credit
Submit company details, diesel demand, the 36-month commitment and proposed site. Credit and commercial terms are assessed before a written agreement.
Confirm access, tank position, power, landlord consent and local authority requirements. Establish whether a self-bunded tank or constructed bund is permitted.
Approved plans, foundations or bund works and power provision must be ready before equipment placement. Allow at least 30 days after agreement and required information.
Complete electrical certification, safety signage, firefighting provisions and required fire-department sign-off before scheduling the first delivery.
Tank installation may be provided at no cost as part of qualifying contracted wholesale bulk diesel supply. Customers must consume and commit to more than 100,000 litres per month, sign a minimum 36-month contract and qualify for 30-day credit terms. Equipment ownership and any site works are confirmed in the written proposal; approval is not automatic.
Yes. Tank placement is available on 30-day credit terms only, subject to credit assessment, management approval and a signed supply agreement. COD, cash, upfront payment and shorter payment periods are not available for this tank-placement programme.
The application offers one 23,000L tank, two 23,000L tanks or one 46,000L tank. Self-bunded tanks or conventional tanks with a bund wall are considered according to site suitability, local approvals and equipment availability.
Allow at least 30 days after the agreement and required information are received for equipment placement, subject to availability, site readiness, logistics and approvals. If self-bunded tanks are not permitted, bund-wall approvals and construction can take six months or longer. A site-specific schedule is confirmed after assessment.
Provide the physical site address, inspection contact, site plan and photos, tanker access details and power availability. We assess municipal, fire and environmental approval status, whether self-bunded tanks are permitted, and landlord consent for leased sites. Any required approvals and fire-department sign-off must be completed before fuel deliveries.
Storage and dispensing arrangements are assessed against applicable SANS 10131 requirements and local authority conditions. The supplied installation guidance references bund containment of 110% of tank capacity and 1.5m clearance inside the bund. Final dimensions, safety distances, electrical certification and approvals must be confirmed for the specific site and current requirements.
Pump and flow-rate needs, meters, hoses, nozzles, fuel management, access controls and telemetry can be specified in the application. The supplied self-bunded examples show Piusi MC70 pumps, extended piping and ladders. The final equipment package is confirmed in the proposal, not guaranteed by the example photographs.
Discuss the new site with GT Fuels before relocating equipment. Relocation, transport, reinstallation, site approvals and any costs must be agreed as part of the ongoing supply arrangement.